Aptech Engineering Services

Basic Information

Po Box 3440
Sunnyvale, CA, 94088

Company Profile

n/a

Additional Details

Field Value
DUNS: n/a
Hubzone Owned: N
Socially and Economically Disadvantaged: N
Woman Owned: N
Number of Employees: n/a


  1. BWR RECIRCULATION INLET SAFE ENDS-A THREAT TO PLANT LIFE ANDSAFETY

    Amount: $49,721.00

    AN ON-GOING THREAT TO THE RESIDUAL LIFETIME AND SAFETY OF BOILING WATER REACTORS (BWRS) IS INTERGRANULAR STRESS CORROSION CRACKING (IGSCC). A COMPONENT OF SPECIAL CONCERN IN THE RECIRCULATION INLET NO ...

    SBIR Phase I 1989 Nuclear Regulatory Commission
  2. UNDER RAPID THERMAL LOADING

    Amount: $49,917.00

    FRACTURE MECHANICS LIFE PREDICTIONS REQUIRE THE DETERMINATION OF CRACK TIP STRESS INTENSITY FACTORS FOR USE IN STRUCTURAL RELIABILITY ASSESSMENTS. STRESSES IN METALLIC COMPONENTS RESULTING FROM RAPID ...

    SBIR Phase I 1986 Air ForceDepartment of DefenseDepartment of Defense
  3. MIXED NDE TRANSDUCERS

    Amount: $49,636.00

    THERE IS A NEED FOR RAPID, ACCURATE, COST-EFFECTIVE NON-DESTRUCTIVE EVALUATION (NDE) OF REUSABLE FLIGHT HARDWARE COMPONENTS AND SYSTEMS AFTER EACH USE TO DETERMINE WHETHER OR NOT THEY HAVE REACHED THE ...

    SBIR Phase I 1984 National Aeronautics and Space Administration

Agency Micro-sites

US Flag An Official Website of the United States Government