APTEK, Inc.

Company Information

Company Name
APTEK, Inc.
Address
1257 Lake Plaza Drive, Suite 100
Colorado Springs, CO, 80906
Phone
1 719-576-8100
URL
n/a
DUNS
55453625
Number of Employees
n/a

Award Totals

PROGRAM/PHASE
AWARD AMOUNT ($)
NUMBER OF AWARDS
SBIR Phase I
$2,110,603.00
34
SBIR Phase II
$7,954,069.00
20
Chart code to be here

Award List

  1. THE DEVELOPMENT OF PASSIVE ACOUSTIC INSTRUMENTATION SYSTEMS AND TECHNOLOGY FOR REENTRY VEHICLE FLIGHT TEST MEASUREMENT OF HYDROMETER MASS AND NUMBER DENSITY IS PROPOSED.

    Amount: $59,644.00

    THE DEVELOPMENT OF PASSIVE ACOUSTIC INSTRUMENTATION SYSTEMS AND TECHNOLOGY FOR REENTRY VEHICLE FLIGHT TEST MEASUREMENT OF HYDROMETER MASS AND NUMBER DENSITY IS PROPOSED.

    SBIR Phase I 1984 Air ForceDepartment of Defense
  2. PROTECTION OF MEDICAL EQUIPMENT AGAINST ELECTROMAGNETIC PULSE

    Amount: $2,080.00

    AS ARMY MEDICAL FIELD AND HOSPITAL EQUIPMENT, THROUGH TECHNOLOGICAL ADVANCES IN INTEGRATED HARDWARE, BECOMES MORE COMPLEX AND SOPHISTICATED, IT LIKEWISE BECOMES MORE SUSCEPTIBLE TO DAMAGE FROM POTENTI ...

    SBIR Phase II 1987 ArmyDepartment of Defense
  3. THE GOAL OF THIS STUDY WILL BE TO PROVE THE FEASIBILITY OF DEVELOPING A HARDENED, LIGHTWEIGHT AFT COVER FOR FUTURE REENTRY VEHICLES.

    Amount: $69,964.00

    THE GOAL OF THIS STUDY WILL BE TO PROVE THE FEASIBILITY OF DEVELOPING A HARDENED, LIGHTWEIGHT AFT COVER FOR FUTURE REENTRY VEHICLES. THE INDIVIDUAL TASKS INCLUDE, DETERMINING MATERIAL AND DESIGN REQUI ...

    SBIR Phase I 1985 Air ForceDepartment of Defense
  4. APTEK, AS PRIME CONTRACTOR, IN CONJUNCTION WITH GENERAL ELECTRIC COMPANY AND SRI INTERNATIONAL, AS SUBCONTRACTORS, WILL CONDUCT A STUDY TO IDENTIFY AND INVESTIGATE CANDIDATE OVERLAY MATERIALS VERSUS SYSTEM REQUIREMENTS FOR BOTH ACTIVE AND PASSIVE DECOYS.

    Amount: $69,964.00

    APTEK, AS PRIME CONTRACTOR, IN CONJUNCTION WITH GENERAL ELECTRIC COMPANY AND SRI INTERNATIONAL, AS SUBCONTRACTORS, WILL CONDUCT A STUDY TO IDENTIFY AND INVESTIGATE CANDIDATE OVERLAY MATERIALS VERSUS S ...

    SBIR Phase I 1985 Defense Threat Reduction AgencyDepartment of Defense
  5. THIS ACTIVITY WILL DEVELOP AND DEMONSTRATE A METHOD TO SUPERIMPOSE A SIGNAL ON DATA CHANNELS WHICH WILL IDENTIFY THE PARTICULAR DATA CHANNEL.

    Amount: $66,738.00

    THIS ACTIVITY WILL DEVELOP AND DEMONSTRATE A METHOD TO SUPERIMPOSE A SIGNAL ON DATA CHANNELS WHICH WILL IDENTIFY THE PARTICULAR DATA CHANNEL. THE SIGNAL WILL BE GENERATED AS A BINARY CODE. INCLUDED WI ...

    SBIR Phase I 1986 Defense Threat Reduction AgencyDepartment of Defense
  6. AN INTERACTIVE OPTIMIZATION-BASED COMPUTER GRAPHICS SOFTWARE PACKAGE

    Amount: $170,000.00

    THE OVERALL GOAL OF THIS STUDY WILL BE TO DEVELOP AN INTERACTIVE, OPTIMIZATION-BASED, COMPUTER GRAPHICS SOFTWARE PACKAGE FOR THE DETERMINATION OF THE OPTIMAL PHYSICAL FIT OF OBJECTS (I.E. WEAPONS, SUB ...

    SBIR Phase II 1987 Air ForceDepartment of Defense
  7. LAMINAR/TURBULENT FLOW DETECTOR

    Amount: $59,695.00

    THE HIGHLY SUCCESSFUL BOUNDARY LAYER ACOUSTIC MONITOR (BLAM) PROGRAM PRODUCED BLAM GAUGES WHICH WERE USED ON MINUTEMAN FLIGHTS TO TEST FLOW AROUND RE-ENTRY VEHICLES (RV), AND DETECT THE LOCATION OF TH ...

    SBIR Phase I 1987 NavyDepartment of Defense
  8. A KNOWLEDGE SUPPORT SYSTEM FOR SATELLITE SURVIVABILITY

    Amount: $296,000.00

    CURRENTLY SURVIVABILITY ASSESSMENTS DO NOT USE ARTIFICIAL INTELLIGENCETECHNIQUES. THE GOAL OF THIS PHASE I PROPOSAL IS TO BUILD A DEMONSTRATABLE KNOWLEDGE SUPPORT SYSTEM TO ASSIST SURVIVABILITY ANALYS ...

    SBIR Phase II 1988 Air ForceDepartment of Defense
  9. STRESS ANALYSIS OF HYPERVELOCITY MODELS UNDER HIGH G-LOADS

    Amount: $443,035.00

    THE OBJECTIVE OF THE PROPOSED WORK IS TO ANALYZE THE HYPERVELOCITY MODELS TESTED AT ARNOLD ENGINEERING DEVELOPMENT CENTER TO DETERMINE THE CAUSE OF NOSETIP FRACTURES. WE WILL ACCOMPLISH THIS GOAL BY P ...

    SBIR Phase II 1990 Air ForceDepartment of Defense
  10. GRAPHICAL ANIMATION OF DYNAMIC FINITE ELEMENT/DIFFERENCE PROGRAM OUTPUT DATA ONTO FILM AND VIDEOTAPE

    Amount: $170,000.00

    THIS WORK WILL DEVELOP A PROCEDURE FOR THE ACOE TO ANIMATE THE OUTPUT DATA FROM VARIOUS FINITE ELEMENT/DIFFERENCE CODES WITH STATE-OF-THEART COLOR COMPUTER GRAPHIC ANIMATION TECHNIQUES. PART OF THIS E ...

    SBIR Phase II 1988 ArmyDepartment of Defense

Agency Micro-sites


SBA logo

Department of Agriculture logo

Department of Commerce logo

Department of Defense logo

Department of Education logo

Department of Energy logo

Department of Health and Human Services logo

Department of Homeland Security logo

Department of Transportation logo

Enviromental Protection Agency logo

National Aeronautics and Space Administration logo

National Science Foundation logo
US Flag An Official Website of the United States Government