You are here

Open

Reset

NOTE: The Solicitations and topics listed on this site are copies from the various SBIR agency solicitations and are not necessarily the latest and most up-to-date. For this reason, you should visit the respective agency SBIR sites to read the official version of the solicitations and download the appropriate forms and rules.


If no search results for your keyword(s) were found, you are encouraged to review Agency omnibus solicitations for additional funding opportunities. Omnibus solicitations are structured to be broad, extensive Programmatic issuances with research areas related to the petitioning Agency and are not limited to predetermined Topics/Subtopics. If upon reviewing you have additional questions, you may consider reaching out to the respective Agency for clarification regarding acceptable proposals (https://www.sbir.gov/agency-contacts).

  1. W: Wireless Technologies (W)

    Release Date: 01-11-2022Open Date: 01-11-2022 Due Dates: Multiple Close Date: 10-26-2022

    The Wireless topic involves next-generation wireless communication technologies requiring systems with high data rates, low cost, and that support a wide variety of applications and services, while maintaining full mobility, minimum latency, and long battery life. Devices and subsystems that increase data throughput rates via cell density, increased spectrum, multiple input, multiple output (MIMO) ...

    SBIR/STTRPhase INational Science Foundation
  2. W2: Wireless Systems

    Release Date: 01-11-2022Open Date: 01-11-2022 Due Dates: Multiple Close Date: 10-26-2022

    W2 SBIR/STTR Phase I (2022) National Science Foundation ...

    SBIR/STTRPhase INational Science Foundation
  3. W1: Wireless Devices and Components

    Release Date: 01-11-2022Open Date: 01-11-2022 Due Dates: Multiple Close Date: 10-26-2022

    W1 SBIR/STTR Phase I (2022) National Science Foundation ...

    SBIR/STTRPhase INational Science Foundation
  4. S7: Wide Bandgap Power Devices and Materials

    Release Date: 01-11-2022Open Date: 01-11-2022 Due Dates: Multiple Close Date: 10-26-2022

    S7 SBIR/STTR Phase I (2022) National Science Foundation ...

    SBIR/STTRPhase INational Science Foundation
  5. AF222-D015: Wear-protection Coatings for 5th/6th Generation Systems

    Release Date: 04-20-2022Open Date: 05-18-2022Due Date: 06-15-2022Close Date: 06-15-2022

    OUSD (R&E) MODERNIZATION PRIORITY: General Warfighting Requirements (GWR) TECHNOLOGY AREA(S): Materials OBJECTIVE: The end state of this project is to have a fully developed wear-protection coating that meets or exceeds 5th/6th generation system requirements. The coatings wear-protection performance shall be demonstrated in an approved laboratory test rig and shall provide an increased lif ...

    SBIRPhase I/Phase IIDepartment of DefenseAir Force
  6. DLA222-006: Verifying Domestic Sourced or Manufactured Coal Tar Pitch Can Meet Military Requirements

    Release Date: 04-20-2022Open Date: 05-18-2022Due Date: 06-15-2022Close Date: 06-15-2022

    OUSD (R&E) MODERNIZATION PRIORITY: General Warfighting Requirements (GWR) TECHNOLOGY AREA(S): Materials/Processes The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administrat ...

    SBIRPhase I/Phase IIDepartment of DefenseDefense Logistics Agency
  7. 22.4 SBIR Annual BAA: Various Topics with Varying Open and Close Dates- See Description for Links

    Release Date: 12-01-2021Open Date: 01-01-2022Due Date: 12-31-2022Close Date: 12-31-2022

    Annual BAA topics are released throughout the year with varying open and close dates. Please visit https://www.dodsbirsttr.mil/topics-app/ and https://rt.cto.mil/rtl-small-business-resources/sbir-sttr/ for specific topic open and close dates as well as BAA documents and instructions.

    SBIRPhase I/Phase IIDepartment of Defense
  8. SF222-0019: Vacuum packaged microfabricated rubidium vapor cells

    Release Date: 04-20-2022Open Date: 05-18-2022Due Date: 06-15-2022Close Date: 06-15-2022

    OUSD (R&E) MODERNIZATION PRIORITY: Quantum Sciences; 5G TECHNOLOGY AREA(S): Sensors; Space Platform; Air Platform OBJECTIVE: Demonstration of a vacuum packaged microfabricated rubidium vapor cell with low helium permeation and temperature control stable to below 10 mK. DESCRIPTION: Atomic clocks have become pervasive in multiple industries for position, navigation, and timing. However, ...

    SBIRPhase I/Phase IIDepartment of DefenseAir Force
  9. SOCOM222-D002: Utilizing ML Algorithms to Track and Identify UAS Threats

    Release Date: 04-20-2022Open Date: 05-18-2022Due Date: 06-15-2022Close Date: 06-15-2022

    OUSD (R&E) MODERNIZATION PRIORITY: Autonomy; Artificial Intelligence/Machine Learning; General Warfighting Requirements (GWR) TECHNOLOGY AREA(S): Sensors; Electronics; Information Systems OBJECTIVE: The objective of this topic is to develop applied research toward an innovative capability to conduct the research, development, and assessment of a lidar based system utilizing Machine Learnin ...

    SBIRPhase I/Phase IIDepartment of DefenseSpecial Operations Command
  10. AF222-0020: Ultra-wideband High Efficiency Power Amplifier for Multifunction RF Systems

    Release Date: 04-20-2022Open Date: 05-18-2022Due Date: 06-15-2022Close Date: 06-15-2022

    OUSD (R&E) MODERNIZATION PRIORITY: Microelectronics TECHNOLOGY AREA(S): Sensors; Electronics OBJECTIVE: Research and develop ultra wideband, high efficiency power amplifier (PA) technology suitable for multifunction transmitter systems. DESCRIPTION: The proliferation of wireless technologies has posed significant challenges to future DoD systems. One of the challenges for sensor techno ...

    SBIRPhase I/Phase IIDepartment of DefenseAir Force
US Flag An Official Website of the United States Government