You are here

Open

Reset

NOTE: The Solicitations and topics listed on this site are copies from the various SBIR agency solicitations and are not necessarily the latest and most up-to-date. For this reason, you should visit the respective agency SBIR sites to read the official version of the solicitations and download the appropriate forms and rules.


If no search results for your keyword(s) were found, you are encouraged to review Agency omnibus solicitations for additional funding opportunities. Omnibus solicitations are structured to be broad, extensive Programmatic issuances with research areas related to the petitioning Agency and are not limited to predetermined Topics/Subtopics. If upon reviewing you have additional questions, you may consider reaching out to the respective Agency for clarification regarding acceptable proposals (https://www.sbir.gov/agency-contacts).

  1. 32: ADVANCED CONCEPTS AND TECHNOLOGY OR PARTICLE ACCELERATORS

    Release Date: 12-14-2020Open Date: 12-14-2020Due Date: 02-22-2021Close Date: 02-22-2021

    32. ADVANCED CONCEPTS AND TECHNOLOGY FOR PARTICLE ACCELERATORS Maximum Phase I Award Amount: $200,000 Maximum Phase II Award Amount: $1,100,000 Accepting SBIR Phase I Applications: YES Accepting STTR Phase I Applications: YES The DOE HEP program supports a broad research and development (R&D) effort in the science, engineering, and technol ...

    SBIR/STTRPhase IDepartment of Energy
  2. 33c: Advanced Conduction Cooling for SRF Systems

    Release Date: 12-14-2020Open Date: 12-14-2020Due Date: 02-22-2021Close Date: 02-22-2021

    c. Advanced Conduction Cooling for SRF Systems The implementation of cryocoolers to reach the operating temperature of both SRF and SC magnet devices is very appealing for compact accelerators as well as stand-alone experimental and medical applications. There are clear opportunities for technology advances that might improve such systems for these applications. Grant applications are sough ...

    SBIR/STTRPhase IDepartment of Energy
  3. 23b: Advanced Coolers for Supercritical Carbon Dioxide Base Power Cycles

    Release Date: 12-14-2020Open Date: 12-14-2020Due Date: 02-22-2021Close Date: 02-22-2021

    b. Advanced Coolers for Supercritical Carbon Dioxide Base Power Cycles A pathway to achieving higher sCO2 power cycle efficiencies can be enabled by operating under condensing sCO2 cycle conditions. The pressure drop through the cooler plays a large factor in the sCO2 cycle efficiency. These coolers are typically modular and to meet the desired heat duty multiple modules are used in a syste ...

    SBIR/STTRPhase IDepartment of Energy
  4. 7: ADVANCED GRID TECHNOLOGIES

    Release Date: 12-14-2020Open Date: 12-14-2020Due Date: 02-22-2021Close Date: 02-22-2021

    7. Advanced GRID TEchnologies Maximum Phase I Award Amount: $200,000 Maximum Phase II Award Amount: $1,100,000 Accepting SBIR Phase I Applications: YES Accepting STTR Phase I Applications: NO The electric power grid is facing increasing stress due to fundamental changes in both supply-side and demand-side technologies. On the supply-side ...

    SBIR/STTRPhase IDepartment of Energy
  5. 26b: Advanced Hydraulic Fracture Diagnostics for Unconventional Oil and Natural Gas Wells

    Release Date: 12-14-2020Open Date: 12-14-2020Due Date: 02-22-2021Close Date: 02-22-2021

    b. Advanced Hydraulic Fracture Diagnostics for Unconventional Oil and Natural Gas Wells This topic invites proposals for research that is focused on developing novel technologies for more accurately characterizing the orientation and dimensions of hydraulic fractures, in support of efforts to reduce the environmental risks and increase the efficiency of fracturing in unconventional oil and n ...

    SBIR/STTRPhase IDepartment of Energy
  6. 8a: Advanced Manufactured High Frequency Link Transformers for Next Generation Grid-tied Energy Storage Power Conversion Systems

    Release Date: 12-14-2020Open Date: 12-14-2020Due Date: 02-22-2021Close Date: 02-22-2021

    a. Advanced Manufactured High Frequency Link Transformers for Next Generation Grid-tied Energy Storage Power Conversion Systems To date, energy storage systems employ line frequency transformers for voltage matching at the point of common coupling and galvanic isolation. However, these transformers can have a large footprint, lossy, noisy, and heavy, which can limit high density power conve ...

    SBIR/STTRPhase IDepartment of Energy
  7. 9: ADVANCED MANUFACTURING

    Release Date: 12-14-2020Open Date: 12-14-2020Due Date: 02-22-2021Close Date: 02-22-2021

    9. ADVANCED MANUFACTURING Maximum Phase I Award Amount: $200,000 Maximum Phase II Award Amount: $1,100,000 Accepting SBIR Phase I Applications: YES Accepting STTR Phase I Applications: YES EERE’s Advanced Manufacturing Office (AMO) (http://energy.gov/eere/amo) collaborates with industry, small business, universities, national laborato ...

    SBIR/STTRPhase IDepartment of Energy
  8. 8: ADVANCED POWER CONVERSION SYSTEM MAGNETICS FOR GRID-TIED ENERGY STORAGE

    Release Date: 12-14-2020Open Date: 12-14-2020Due Date: 02-22-2021Close Date: 02-22-2021

    8. Advanced POWER cONVERSION sYSTEM mAGNETICS FOR grid-tied energy storage Maximum Phase I Award Amount: $200,000 Maximum Phase II Award Amount: $1,100,000 Accepting SBIR Phase I Applications: YES Accepting STTR Phase I Applications: NO The widespread adoption of grid-tied energy storage systems continues to grow, especially due to i ...

    SBIR/STTRPhase IDepartment of Energy
  9. 7a: Advanced Protective Relaying Technologies and Tools

    Release Date: 12-14-2020Open Date: 12-14-2020Due Date: 02-22-2021Close Date: 02-22-2021

    a. Advanced Protective Relaying Technologies and Tools The reliability of an electric transmission or distribution system in response to a fault is heavily dependent upon the underlying protection scheme that is being utilized to identify and respond to that fault. The equipment that forms the basis of these schemes include: · Protective relays which respond to electrical quanti ...

    SBIR/STTRPhase IDepartment of Energy
  10. 34c: Advanced Quality Control Instruments and Services for Ultrafast Laser Optics

    Release Date: 12-14-2020Open Date: 12-14-2020Due Date: 02-22-2021Close Date: 02-22-2021

    c. Advanced Quality Control Instruments and Services for Ultrafast Laser Optics As scientific laser systems increase in repetition rate and peak power, the quality of optics and damage threshold of optics becomes increasingly critical. Laser Induced Damage Threshold (LIDT) and the overall performance of optics for high average power (HAP) and high peak power (HPP) applications varies greatl ...

    SBIR/STTRPhase IDepartment of Energy
US Flag An Official Website of the United States Government