You are here

Closed

Reset

NOTE: The Solicitations and topics listed on this site are copies from the various SBIR agency solicitations and are not necessarily the latest and most up-to-date. For this reason, you should visit the respective agency SBIR sites to read the official version of the solicitations and download the appropriate forms and rules.

Displaying 17151 - 17160 of 18911 results
  1. S1.08: Surface & Sub-surface Measurement Systems

    Release Date: 11-12-2015Open Date: 11-12-2015Due Date: 02-01-2016Close Date: 02-01-2016

    Lead Center: ARC Participating Center(s): GSFC, JPL, LaRC, MSFC, SSC Surface & Sub-surface Measurement Systems are sought with relevance to future space missions such as Active Sensing of CO2 Emissions over Nights, Days, and Seasons (ASCENDS), Orbiting Carbon Observatory – 2 (OCO-2), Global Precipitation Measurement (GPM), Geostationary Coastal and Air Pollution Events (GEO-CAPE), Hyperspectral ...

    SBIRPhase INational Aeronautics and Space Administration
  2. S1.08: Surface & Sub-surface Measurement Systems

    Release Date: 11-17-2016Open Date: 11-17-2016Due Date: 01-20-2017Close Date: 01-20-2017

    Lead Center: ARC Participating Center(s): GSFC, JPL, LaRC, MSFC, SSC Technology Area: TA8 Science Instruments, Observatories & Sensor Systems Surface & Sub-surface Measurement Systems are sought with relevance to future space missions such as Active Sensing of CO2 Emissions over Nights, Days, and Seasons (ASCENDS), Orbiting Carbon Observatory 2 (OCO-2), Global Precipitation Measurement (GPM), Geos ...

    SBIRPhase INational Aeronautics and Space Administration
  3. S5.03: Surface and Subsurface Robotic Exploration

    Release Date: 07-18-2011Open Date: 07-18-2011Due Date: 09-08-2011Close Date: 09-08-2011

    Technologies are needed to enable access, mobility, and sample acquisition at surface and subsurface sampling sites of scientific interest on Mars, Venus, small planetary bodies, and the moons of Earth, Mars, Jovian and Saturnian systems.

    SBIRPhase INational Aeronautics and Space Administration
  4. 08a: Surface Compatibility of Cellulosic Nanomaterial in Hydrophobic Matrix Materials

    Release Date: 10-31-2016Open Date: 11-28-2016Due Date: 02-07-2017Close Date: 02-07-2017

    08a DOE SBIR/STTR 2017 Phase I Release 2 Department of Energy ...

    SBIR/STTRPhase IDepartment of Energy
  5. N141-036: Surface Composite Tracker Component

    Release Date: 11-20-2013Open Date: 12-20-2013Due Date: 01-22-2014Close Date: 01-22-2014

    OBJECTIVE: Develop a composite tracker component for AEGIS Weapon System that combines multiple sensor sources to optimize surface vehicular track accuracy. DESCRIPTION: US Navy Ships have sophisticated command and control systems that manage data from multiple sensors to generate and maintain the tactical picture. The command and control system manages track-to-track association; track correl ...

    SBIRPhase IDepartment of DefenseNavy
  6. T7.04: Surface Construction

    Release Date: 11-09-2020Open Date: 11-09-2020Due Date: 01-08-2021Close Date: 01-08-2021

    Lead Center: KSCParticipating Centers: GRC, MSFCScope Title:Surface ConstructionScope Description:Surface construction technologies must be developed to support long-term sustainable human presence on the lunar and eventually Martian surfaces. To enable a sustained human presence on the Moon, multiple assets are likely to be landed proximal to each other. While the Apollo landers demonstrated t ...

    STTRPhase INational Aeronautics and Space Administration
  7. Z1.02: Surface Energy Storage

    Release Date: 11-17-2016Open Date: 11-17-2016Due Date: 01-20-2017Close Date: 01-20-2017

    Lead Center: GRC Participating Center(s): JPL, JSC Technology Area: TA3 Space Power and Energy Storage NASA is seeking innovative energy storage solutions for surface missions on the moon and Mars. The objective is to develop energy storage systems for landers, construction equipment, crew rovers, and science platforms. Energy requirements for mobile assets are expected to range up to 120 kW-hr wi ...

    SBIRPhase INational Aeronautics and Space Administration
  8. CBD213-001: Surface-Enhanced Raman Scattering Substrate Development

    Release Date: 08-25-2021Open Date: 09-21-2021Due Date: 10-21-2021Close Date: 10-21-2021

    OBJECTIVE: To develop a metallic surface-enhanced Raman scattering (SERS) substrate to be utilized for augmentation of current/future Raman spectroscopic portable instrumentation for the detection of trace and residual chemical materials. The substrates should consist of nanostructured metals, preferably gold or silver, on a porous or non-porous material backing (such as filter paper, silicon, ga ...

    SBIRPhase I/Phase IIDepartment of DefenseOffice for Chemical and Biological Defense
  9. 6: SURFACE MAPPING MICROANALYSIS

    Release Date: 12-14-2020Open Date: 12-14-2020Due Date: 02-22-2021Close Date: 02-22-2021

    6. surface mapping MICROANALYSiS Maximum Phase I Award Amount: $200,000 Maximum Phase II Award Amount: $1,100,000 Accepting SBIR Phase I Applications: YES Accepting STTR Phase I Applications: NO Nuclear forensics analysis often involves combining information from several microanalytical imaging technologies (e.g., optical microscopy, sca ...

    SBIR/STTRPhase IDepartment of Energy
  10. A13-004: Surface Mesh Refinement Guide Tool for Computational Fluid Dynamics Applications

    Release Date: 11-16-2012Open Date: 12-17-2012Due Date: 01-16-2013Close Date: 01-16-2013

    OBJECTIVE: To develop a fluid dynamics-based diagnostic tool to guide the initial creation of computationally economical surface grids for computational fluid dynamics simulations of military aircraft, missiles and associated subcomponents. DESCRIPTION: For all of the continuous development in the field of Computational Fluid Dynamics (CFD), a certain degree of art is still required t ...

    SBIRDepartment of DefenseArmy
US Flag An Official Website of the United States Government